Multi-Utilities Wynyard West – Wynyard Estates, Wynyard

Their Challenge: Wynyard Estates required a comprehensive utility solution for the prestigious Wynyard West development, accommodating future phases by Cameron Hall Developments, Bellway, and Banks Group. The challenge included phasing out gas, increasing electric usage for hot air pumps and PV panels, and ensuring future-proof infrastructure and technology needs. Additionally, bespoke street lighting and utilities […]

Location

  • Wynyard

Sector

  • Multi-Utilities

Their Challenge:

Wynyard Estates required a comprehensive utility solution for the prestigious Wynyard West development, accommodating future phases by Cameron Hall Developments, Bellway, and Banks Group. The challenge included phasing out gas, increasing electric usage for hot air pumps and PV panels, and ensuring future-proof infrastructure and technology needs. Additionally, bespoke street lighting and utilities for commercial and industrial phases were necessary.

Our Solution

The Team developed a multi-utility strategy early on for Wynyard Estates, adopting a New Asset Value (NAV) approach through an Independent Distribution Network Operator (IDNO) for both foul and clean water networks. This provided design flexibility, use of modern materials, and cost efficiency.

In coordination with Applebridge Construction, a streamlined construction programme was developed. An interim electric solution was provided to maintain the construction schedule before the substations went live. Bespoke street lighting was designed for adoptable and un-adoptable areas, ducting network were installed for CCTV, and utilities were provided for commercial and industrial units, including car charging points.

Scope Of Works

  • Applebridge Utilities was appointed to conduct the following packages of works:
  • Water and Electric Mains & Service Connections for 76 Plots
  • Gas supply for 6 Flats, 7 Commercial units, and 54 Plots Water, Electric Mains & Service Connections for 81 Plots
  • Design and installation of bespoke high-spec street lighting
  • Installation of CCTV ducting network
  • Provision of utilities to commercial and industrial units, including car charging points

The Results

The works at Wynyard West are progressing steadily and on schedule, with the multi-utility strategy effectively supporting the project’s requirements.

Find Us

Hughes House
Cargo Fleet Road
Middlesbrough
TS3 6AG

Sat Nav TS3 6AF

Contact Us

01642 233400
info@applebridge.com

Office Opening Hours
Monday - Friday 08:00 - 17:30

Get in Touch

Our Family